Lake Belt Phase II Detailed Master Plan Preliminary Draft Alternative Concepts Memorandum, 2000-05-04
- Containers:
- Box 15, Folder 11, Item 2
- Scope and content:
Submitted to South Florida Regional Planning Council and the Lake Belt Committee. Submitted by Wallace Roberts and Todd, LLC and EAS Engineering, Inc.
Access and use
- Location of this collection:
-
The University of South Florida, Tampa Campus4202 East Fowler Ave. LIB122TampaFL33620-5400USA